One of our most recent exciting projects that we have undertaken was the purchase and removal of this 625 KW Blue Box brand chiller, we arrived on site in Southampton bright and early at 7 am where we put on our full PPE and after being inducted into the site, we headed up to the roof top where the chiller was located. We proceeded to unbolt the chiller from the base it was sat on, unbolt the flanges so that it was free from all of the connecting pipe work and remove any of the electrical connections which were made safe by the on-site electrician the day prior. Once the chiller was free, we slung it with our ten tonne rated strops and waited on the arrival of our crane and flat bed. Upon arrival the chiller was swiftly and safely loaded and our client was paid in full before the chiller left site. Another happy client.